UNILEVER MASHREQ

Project Title

Factory Relocation – Project Red Sea – Relocation Of Shampoo And Toothpaste Line From Unilever Jeddah (Ksa) To Unilever Cairo (Egypt) Factory.

Type of Contract

TURNKEY CONTRACT

Year of Execution

2018-2019

Major Equipments

Shampoo Manufacturing Line, Tooth paste Manufacturing line, Heat exchanger, Product Pumps, Clean in Process System, Product Pipelines & Conveyors Cabling & Electrical/Control Panels.

Dismantling Works

Mark up/Labelling or tagging of equipment’s and service lines. LOTO of utility services/lines. Dismantling & stacking of equipment’s

Electrical & Instrumentation Works

LV Panels, MCCs, SMDBs, VFD & HMI/Control Panels. Power/control/signal/communication Cables. Field isolators, sensors, instruments & components. Cable trays and cable management systems.

Reinstallation of Equipments

Container/Truck Unloading. Unpacking & shifting of equipment’s/consignments. Positioning, alignment, levelling and anchoring of equipment’s. Utility tie in connections. Testing and commissioning assistance.

Packing & Transportation

40 containers of machineries. Seaworthy vacuum packaging & shipping. Tagging and shipping using wooden crates. Document generation using images and videos. Container/Truck Loading.

Mechanical Works

Unscrambler and feed conveyor. Orineter, OCME Filler & Zalkin Capper. Case packer, Cap sorter and feeder. FRYMA Mixer & storage tanks. Cartooning machine Wrapping machine.