Projects

  • Cross country pipeline
  • EPC Projects
  • Factory Relocation
  • Hygienic process factory
  • Mla & dry conveying system
  • Pontoon & fuel dispenser
  • Shutdown Projects

  • Tristar Engineering
  • Dolphin Energy
  • Emarat – Etihad Rail
  • SEWA – Natural Gas Pipeline
  • Emarat – 48” Natural Gas
  • Emarat – FCC Pipeline
Tristar Engineering

Utility Piping Works for Bridges 1 between Um Lafina Island and Al Reem Island

Project Title

Utility Piping Works for Bridges 1 between Um Lafina Island and Al Reem Island

Client

Tristar Engineering & TRANSCO

Location

Umm Lafina Island – Al Reem Island

Year

2021

Contract Type

Engineering & Construction

Project Overview

Tekzone executed a 2 km, 48” diameter pipeline across bridges using advanced installation systems.

Scope Highlights

  • 48" FBE Coated Pipeline Installation
  • Roller Supports & Custom Trolley System
  • Epoxy Coating & GRP Pipelines

Key Achievements

  • 100% Radiography & Hydro Testing
  • Efficient Bridge Installation
  • High-Quality Pipeline Infrastructure
Dolphin Energy

Installation of 20” size Natural Gas piping with MOV and ROV for the Fujairah F3 Power plant.

Project Title

Installation of 20” size Natural Gas piping with MOV and ROV for the Fujairah F3 Power plant.

Client

Dolphin Energy/ Fujairah F3 Power Plant

Location

Fujairah, UAE

Year

2021

Contract Type

EPC

Project Overview

Installation of 20” natural gas pipeline ensuring reliable energy transport.

Scope Highlights

  • 20” 3LPE pipeline installation
  • Welding & integration
  • Testing & commissioning

Key Achievements

  • Seamless integration
  • High operational reliability
  • Strengthened gas infrastructure
Emarat – Etihad Rail

14” Natural Gas Pipeline

Project Title

14” Natural Gas Pipeline

Client

Etihad Rail/ Emirates General Petroleum Corporation (EMARAT)

Location

Fujairah, UAE

Year

2022

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone delivered a 14” natural gas pipeline project in Fujairah, involving underground installation and high-pressure pipeline systems with full radiographic testing.

Scope Highlights

  • Installation of 14” (DN350) carbon steel pipeline (API 5L Gr. X52)
  • External 3LPE coating
  • Underground pipeline installation
  • 100% radiography testing

Key Achievements

  • High-pressure pipeline system delivered successfully
  • Executed across mixed terrain (mountain + sandy)
  • Ensured safety and operational reliability
SEWA – Natural Gas Pipeline

Kalba - Khorfakkan CS Gas Pipeline Project

Project Title

Kalba - Khorfakkan CS Gas Pipeline Project

Client

Sharjah Electricity, Water and Gas Authority (SEWA)

Location

Sharjah to Kalba, Fujairah

Year

2023

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone is executing a cross-country natural gas pipeline project for SEWA across mixed terrain, including mountainous and sandy areas. The project involves advanced coating systems and non-destructive testing techniques.

Scope Highlights

  • 4KM, Installation of 10” (DN250) carbon steel pipeline (API 5L Gr. X42)
  • External 3LPE coating with HSS wrapping
  • Underground installation with holiday testing
  • PAUT (Phased Array Ultrasonic Testing)
  • High-pressure pipeline testing

Key Achievements

  • Executed in challenging terrain conditions
  • Advanced NDT methods (PAUT) implemented
  • Designed for up to 120 bar test pressure
  • Ongoing project with strong safety compliance
Emarat – 48” Natural Gas

48” Natural Gas Pipeline Project – Sharjah

Project Title

48” Natural Gas Pipeline Project – Sharjah

Client

Emirates General Petroleum Corporation (EMARAT)

Location

Sharjah, UAE

Year

2024

Contract Type

Engineering & Construction

Project Overview

Tekzone executed a major cross country pipeline project involving a 48” natural gas pipeline, including deep excavation, pipeline replacement, and advanced installation techniques. This flagship project demonstrates Tekzone’s capability in handling large-diameter, high-pressure pipeline systems.

Scope Highlights

  • • Installation of 48” (DN1200) carbon steel pipeline (API 5L Gr. X52)
  • • Deep excavation up to 9 meters with dewatering
  • Cold cutting, removal, and replacement of 48” & 20” pipelines
  • Heavy lifting using 6 cranes
  • Cold bending and visco-elastic wrapping
  • Nitrogen purging and hydro testing

Key Achievements

  • Executed large-diameter pipeline installation successfully
  • Managed complex excavation and replacement works
  • Completed 14 km pipeline testing and integration
  • Demonstrated expertise in high-pressure gas infrastructure
Emarat – FCC Pipeline

EPC of Buried On- Shore Natural Gas Pipeline in Fujairah Area (FCC Pipeline Project)

Project Title

EPC of Buried On- Shore Natural Gas Pipeline in Fujairah Area (FCC Pipeline Project)

Client

Emirates General Petroleum Corporation (EMARAT)

Location

Fujairah, UAE

Year

2026

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone is executing a 6 km, 10” natural gas pipeline project in Fujairah, involving underground installation with 3LPE coated carbon steel pipelines. The project includes high-pressure pipeline construction with advanced testing and safety compliance.

Scope Highlights

  • Installation of 10” (DN250) carbon steel pipeline (API 5L Gr. X52)
  • External 3LPE coating for corrosion protection
  • Underground installation with PLR station
  • Road crossings (3 Nos.)
  • 100% radiography testing (RT)

Key Achievements

  • High-pressure pipeline designed for 80 bar operation
  • Executed in challenging sandy terrain
  • Strong focus on safety and quality compliance

  • BRF
  • Songwon PAT
  • Safe Water Chemicals
  • Nihon Kohden
  • Union Chlorine
  • Tencate Grass
  • INDADD
  • 44.01 Earth
  • Firewater Main Ring Pipe Installation
BRF

Sadia Chicken Production Facility – BRF

Project Title

Sadia Chicken Production Facility – BRF

Client

BRF (Sadia UAE)

Location

Kezad, Abu Dhabi

Year

2013–2014

Contract Type

Engineering, Procurement & Construction

Project Overview

Tekzone executed a turnkey EPC industrial project in the UAE for the construction of a food grade factory for Sadia Chicken, delivering 10 key process and utility service systems, including steam boiler, thermal heater, compressed air, frying oil, sanitization, lab gas, LPG/LNG, and CO2. The project ensured seamless operations and strengthened industrial infrastructure.

Scope Highlights

  • Process Factory Construction for Food/Beverage Facility
  • Steam boiler & thermal heater systems
  • Compressed air & diesel systems
  • Edible oil storage tanks with hygienic piping
  • Lab gas and CO2 systems integration
  • Automation and instrumentation systems

Key Achievements

  • Turnkey EPC solution in Dubai delivered successfully
  • High operational efficiency and safety compliance
  • Complex industrial systems integrated seamlessly
Songwon PAT

Polymer Additives Plant – Songwon PAT

Project Title

Polymer Additives Plant – Songwon PAT

Client

Songwon Polymer Additive Technologies (PAT)

Location

Kezad, Abu Dhabi

Year

2014–2015

Contract Type

Engineering, Procurement & Construction

Project Overview

Tekzone delivered a complete turnkey EPC solution in the UAE for the Polymer Additives Plant, including the erection of key equipment like SILO, KHAL, and PLASMEC, along with process and utility piping systems, a dedusting system, process plant electrical & instrumentation, and steel structural towers for equipment.

Scope Highlights

  • Installation of key process equipment (SILO, KHAL, PLASMEC)
  • Nitrogen, compressed air, chilled/cooling water, and dedusting systems
  • Stainless steel, carbon steel, and galvanized steel piping
  • Electrical cable tray and cable installation, including MCC, VFD, RIO, PLC panels, and isolators
  • Steel structure construction for material handling

Key Achievements

  • Complex chemical plant construction executed on schedule
  • Enhanced process efficiency and safety standards
  • Full turnkey EPC delivery from engineering to commissioning
Safe Water Chemicals

40 TPD (Ton Per Day) Plant Upgradation – Safe Water Chemicals

Project Title

40 TPD (Ton Per Day) Plant Upgradation – Safe Water Chemicals

Client

Safe Water Chemicals

Location

ICAD, Abu Dhabi

Year

2015–2016

Contract Type

Engineering, Procurement & Construction

Project Overview

Tekzone constructed the chemical plant through a turnkey EPC industrial project in the UAE, supplying and installing hydrochloric acid storage tanks, a salt saturator, a brine softener, and integrated piping. Multi-material pipelines ensured safety and operational efficiency.

Scope Highlights

  • Hydrochloric acid storage (400 m³ SS316L & 150 m³ MS tanks)
  • Salt saturator & brine softener system installation
  • Multi-material piping integration (SS, CS, cPVC, FRP)
  • Process plant electrical & instrumentation, including DC bus duct system, MCCs, and PDBs

Key Achievements

  • Successful chemical plant upgradation delivered
  • Enhanced chemical storage safety and operational capacity
  • Turnkey EPC solution in Dubai executed efficiently
Nihon Kohden

Medical Reagent Production Facility – Nihon Kohden

Project Title

Medical Reagent Production Facility – Nihon Kohden

Client

Nihon Kohden

Location

DAFZA, Dubai

Year

2017

Contract Type

Engineering, Procurement & Construction

Project Overview

Tekzone Constructed a pharmaceutical production facility as a complete EPC Design and Built Project, including reagent, diluent, and detergent systems, an RO system, a clean room with HEPA filters, chemical storage, HVAC, and fire-fighting systems. Full process plant electrical & instrumentation and automation were implemented using PLC & HMIs, showcasing Tekzone’s role as a top industrial EPC contractor in the UAE.

Scope Highlights

  • • Process system design & installation (reagent, diluent, detergent)
  • Clean room with HEPA filters & HVAC integration
  • Automation: Siemens PLC, HMIs, control panels
  • Electrical cabling installation, LED lighting, CCTV, and network systems
  • Pharma-grade tanks (SS316L, polypropylene)

Key Achievements

  • Complete turnkey EPC solutions in Dubai for the healthcare & pharma industry
  • Advanced process plant electrical & instrumentation implemented
  • High-quality standards and operational readiness achieved
Union Chlorine

Phase II Calcium Chloride Plant – Union Chlorine

Project Title

Phase II Calcium Chloride Plant – Union Chlorine

Client

Union Chlorine L.L.C

Location

ICAD-III, Abu Dhabi

Year

2016–2017

Contract Type

Engineering, Procurement & Construction

Project Overview

Tekzone executed Balance of Plant construction for the Union Chlorine plant, including the expansion of an 85 TPD calcium chloride plant, integrating critical systems such as natural gas, filter press, granulation, reactor units, prill tower, and evaporation units.

Scope Highlights

  • Piping in titanium, stainless steel, carbon steel, galvanized steel, and FRP
  • Structural works: steel building, staircases, platforms, roofing
  • Process plant electrical & instrumentation, including LV panels, MCCs, SMDBs, and control panels
  • Calibration, field configuration, earthing, lightning protection, and plant lighting

Key Achievements

  • Turnkey EPC industrial project in the UAE delivered for chemical plant expansion
  • Complex process systems integrated successfully
  • Compliance with industrial safety and operational standards
Tencate Grass

TENCATE GRASS – EPC Electrical Distribution System

Project Title

TENCATE GRASS – EPC Electrical Distribution System

Client

TENCATE GRASS

Location

UAE

Year

2023

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone converted a warehouse into a fully operational factory for TENCATE GRASS. The project focused on electrical systems and infrastructure installation, demonstrating Tekzone as a leading EPC warehouse-to-factory conversion contractor in the UAE.

Scope Highlights

  • Supply, fabrication, and installation of 2 km of cables and supporting cable trays with earthing systems, including earth pit and earth station
  • HV cabling works, RMU, transformers, MDB with bus coupler, automatic power factor control panel (APFC), SMDB, LDB, FDB, isolators
  • Glanding, termination, FAT, and IR testing of electrical systems
  • Power-up and commissioning of the installation

Key Achievements

  • Fully functional factory achieved from warehouse conversion
  • High-quality electrical and operational setup
  • Reinforced Tekzone’s expertise in EPC warehouse-to-factory conversion in the UAE
INDADD

INDADD – Industrial Additive Plant

Project Title

INDADD – Industrial Additive Plant

Client

INDADD

Location

Jubail, KSA

Year

2025

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone Constructed a paint dryer chemical production facility as a complete EPC Project, including supply and installation of process equipments like reactors, mixer tanks, condensers, supply and installation of storage tanks, structural platforms, piping works, civil and E&I works for the plant.

Scope Highlights

  • Supply and installation of Reactor, mixer tank and condenser
  • Construction of Structural Steel Platforms for the plant
  • Supply and Installation of 2 No's 250 Cu.M Tanks with all the civil mechanical and E&I works
  • Electrical & Instrumentation for the plant
  • Utility Piping Works
  • Civil Works for the plant process systems

Key Achievements

  • Turnkey EPC industrial project in KSA delivered for chemical plant construction
  • Complex process systems supplied and integrated successfully
  • Compliance with KSA industrial safety and operational standards
44.01 Earth

ACE 2.5 - CO₂ Mineralization Process

Project Title

ACE 2.5 - CO₂ Mineralization Process

Client

44.01 earth

Location

Fujairah, UAE

Year

2025

Contract Type

Engineering, Procurement & Construction

Project Overview

Tekzone supported our client 44.01 earth to scale up their existing CO2 capture and mineralization project from 2 ton to 20 ton per day capacity by installing the Liquid CO2 storage system, LCO2 injection pump system, water injection system, liquid tracing system, metering and CO2 infusion system, with all the civil, mechanical, piping connections, electrical and instrumentation works and integration with their master PLC system.

Scope Highlights

  • Liquid CO2 storage system
  • LCO2 injection pump system
  • Water injection system
  • Liquid Tracing system
  • Metering and CO2 infusion system
  • Civil Works for the upgradation
  • Mechanical and Piping works
  • Electrical, Instrumentation works including integration with master PLC

Key Achievements

  • Complete turnkey EPC solutions in Dubai for the Carbon Capture and Mineralization
  • Advanced process electrical & instrumentation implemented
  • High-quality standards and operational readiness achieved
Firewater Main Ring Pipe Installation

Firewater Main Ring Pipe Installation – Terminal 2

Project Title

Firewater Main Ring Pipe Installation – Terminal 2

Client

Emirates Petroleum Products Company (EPPCO)

Location

Dubai, UAE

Year

2023

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone designed and executed the installation of a 1.5 km, 14” FBE coated carbon steel firewater main ring pipeline for EPPCO Terminal 2. The project ensured reliable fire protection infrastructure supported by robust civil works using pneumatic suction machine for excavation and structural works.

Scope Highlights

  • Supply and installation of 14” FBE coated carbon steel pipeline
  • Fabrication and installation of civil foundations and structural supports
  • Testing and commissioning works
  • Compliance with fire safety regulations and authority approvals

Key Achievements

  • Strengthened fire safety infrastructure
  • Delivered high-quality FBE coated pipeline system
  • Enhanced reliability of process plant piping network

  • IFFCO
  • UNILEVER
  • MATTEX
  • ASSA ABLOY
IFFCO

Ice Cream Factory Relocation – Dubai Industrial Park (DIP)

Project Title

Ice Cream Factory Relocation – Dubai Industrial Park (DIP)

Client

IFFCO

Location

Dubai Industrial Park (DIP), UAE

Year

2019

Contract Type

Factory Relocation

Project Overview

Tekzone successfully managed the relocation of an ice cream production facility for IFFCO, transferring equipment from Al Ain to Dubai Industrial Park. The project ensured smooth transition, operational continuity, and strict adherence to hygienic standards throughout the relocation process.

Scope Highlights

  • Installation of static and rotary machines, mixing units, and pasteurization systems
  • Hygienic-grade product piping, conveyors, chocolate tanks, and mixing tanks
  • Installation of glucose transfer pumps
  • Electrical cabling and control panel works
  • Seaworthy packing, tagging, and transportation using wooden crates

Key Achievements

  • Zero downtime during factory relocation
  • Maintained hygiene and production standards
  • End-to-end relocation including packing, transport, and reinstallation
  • Delivered complete turnkey relocation solution
UNILEVER

Production Line Relocation – Cairo

Project Title

Production Line Relocation – Cairo

Client

Unilever

Location

Cairo, Egypt

Year

2019

Contract Type

Factory Relocation

Project Overview

Tekzone executed the relocation of a production line for Unilever, ensuring safe transfer, installation, and commissioning of process equipment. The project demonstrated Tekzone’s capability in handling international industrial relocation projects.

Scope Highlights

  • Installation of heat exchangers, pumps, and process equipment
  • CIP systems and hygienic-grade piping installation
  • Conveyor systems for finished products
  • Electrical cabling and panel installation
  • Packing, tagging, shipping, and documentation

Key Achievements

  • Successful cross-country production line relocation
  • Maintained quality and safety standards
  • Delivered full turnkey relocation from dismantling to commissioning
MATTEX

Factory Relocation – Jeddah

Project Title

Factory Relocation – Jeddah

Client

Mattex

Location

Jeddah, Saudi Arabia

Year

2021

Contract Type

Construction / Factory Relocation

Project Overview

Tekzone executed the relocation of Mattex’s manufacturing facility from Abu Dhabi to Jeddah, managing complex machinery, electrical systems, and instrumentation to ensure seamless startup at the new location.

Scope Highlights

  • Packing and transport of extrusion lines, yarn equipment, winders, and weaving machines
  • Relocation of electrical and instrumentation systems
  • Installation and connection of machinery
  • Testing and commissioning of systems

Key Achievements

  • Efficient international factory relocation
  • Minimized operational downtime
  • Achieved full operational readiness at new facility
  • Delivered turnkey relocation with complete system integration
ASSA ABLOY

Entrance Systems Factory Relocation

Project Title

Entrance Systems Factory Relocation

Client

Assa Abloy

Location

National Industries Park (NIP), UAE

Year

2023

Contract Type

Factory Relocation

Project Overview

Tekzone managed the relocation of Assa Abloy’s entrance systems factory from Jebel Ali Industrial Area to NIP, UAE. The project included equipment transfer, structural modifications, and commissioning, ensuring smooth operations at the new facility.

Scope Highlights

  • Relocation of electrical and instrumentation equipment
  • Structural and piping modifications
  • Installation and connection of machinery
  • Testing and commissioning

Key Achievements

  • Smooth transition to new facility
  • Maintained operational and safety standards
  • Delivered complete turnkey factory relocation solution

  • Oman Milk Production Company (Ompc)
  • AL AIN FARMS
  • MAI DUBAI
  • GRADE REFRIGERATION – BALADNA DAIRY PLANT
  • Unilever – Warehouse Conversion
Oman Milk Production Company (Ompc)

OMPC Mega Plant – Hygienic Piping Installation

Project Title

OMPC Mega Plant – Hygienic Piping Installation

Client

Oman Milk Production Company (OMPC)

Location

Oman

Year

2016

Contract Type

Construction

Project Overview

Tekzone executed hygienic piping installation for the OMPC Mega Plant in collaboration with Tetra Pak, delivering food-grade stainless steel piping systems for dairy and juice processing. The project ensured high standards of hygiene, safety, and operational efficiency in compliance with industry regulations.

Scope Highlights

  • Installation of food-grade stainless steel piping
  • Homogenizer, CIP lines, juice filling, and aseptic piping systems
  • Powder handling piping systems
  • Compliance with SMS hygienic standards

Key Achievements

  • Delivered high-quality hygienic piping solutions
  • Improved efficiency of dairy and juice processing systems
  • Ensured compliance with strict food safety standards
AL AIN FARMS

Hygienic Piping Upgrade

Project Title

Hygienic Piping Upgrade

Client

Al Ain Farms

Location

Location Al Ain, UAE

Year

2018

Contract Type

Construction

Project Overview

Tekzone upgraded the facility with hygienic piping systems, ensuring safe and efficient beverage production. The project included installation of stainless steel piping and structural supports aligned with food industry standards

Scope Highlights

  • Supply and installation of food-grade stainless steel piping
  • Installation of stainless steel supports
  • Utility piping upgrades

Key Achievements

  • Achieved high hygiene and safety standards
  • Improved operational reliability
  • Met stringent food industry compliance requirements
MAI DUBAI

Low Pressure Compressed Air System Upgrade

Project Title

Low Pressure Compressed Air System Upgrade

Client

Mai Dubai

Location

Dubai, UAE

Year

2018

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone upgraded the compressed air system using hygienic piping solutions, including carbon steel piping and structural supports. The project enhanced operational efficiency and safety within the beverage production facility.

Scope Highlights

  • Carbon steel piping installation for compressed air system
  • Structural supports installation
  • Electrical cabling and system integration

Key Achievements

  • Improved system reliability and stability
  • Enhanced hygienic operations
  • Ensured safe and efficient production processes
GRADE REFRIGERATION – BALADNA DAIRY PLANT

Baladna Dairy Plant – Hygienic Piping Installation

Project Title

Baladna Dairy Plant – Hygienic Piping Installation

Client

GRADE Refrigeration

Location

Qatar

Year

2021

Contract Type

Construction

Project Overview

Tekzone delivered hygienic piping installation for the Baladna Dairy Plant, including utility piping systems and structural supports. The project ensured compliance with food-grade standards and enhanced plant performance.

Scope Highlights

  • Supply and installation of utility piping systems
  • Installation of structural supports
  • Compliance with food & beverage hygiene standards

Key Achievements

  • Improved operational capacity of the dairy plant
  • Delivered durable and hygienic piping systems
  • Ensured compliance with industry standards
Unilever – Warehouse Conversion

Warehouse Conversion to Personal Care Products Plant

Project Title

Warehouse Conversion to Personal Care Products Plant

Client

Unilever

Location

Dubai Industrial City (DIC), UAE

Year

2016

Contract Type

Construction / Warehouse Conversion

Project Overview

Tekzone transformed a warehouse into a fully operational personal care manufacturing plant, including installation of process systems, hygienic piping, and electrical infrastructure.

Scope Highlights

  • Installation of hygienic piping systems for product transfer
  • Carbon steel piping for utility systems
  • Installation of process and storage tanks with access platforms
  • Electrical infrastructure: cable trays, control panels, MCC panels, and server systems

Key Achievements

  • Successful conversion to a fully functional production facility
  • Compliance with hygiene and safety standards
  • Strengthened expertise in factory conversion projects

  • DEWA
  • DUBAI NATURAL GAS CO. LTD (DUGAS)
  • EPPCO INTERNATIONAL LTD
  • DRY CONVEYING SYSTEM PROJECTS
  • SILAL
  • DEWA
DEWA

FMC Manual Marine Loading Arms Installation – JAFZA

Project Title

FMC Manual Marine Loading Arms Installation – JAFZA

Client

Dubai Electricity and Water Authority (DEWA)

Location

JAFZA, Dubai, UAE

Year

2022

Contract Type

Construction

Project Overview

Tekzone executed a construction project for DEWA, involving the replacement of existing 12-inch Woodfield Marine Loading Arms with new 12-inch FMC Manual Marine Loading Arms at Berth No.1, JAFZA. The scope included civil, mechanical, and pipeline installation works, ensuring safe and efficient marine loading operations.

Scope Highlights

  • Dismantling of existing Woodfield Marine Loading Arms
  • Installation of new 12” FMC Manual Marine Loading Arms
  • Civil works for foundation construction
  • Mechanical and piping works
  • Project approvals and coordination

Key Achievements

  • Enhanced safety and efficiency of marine loading operations
  • Completed within schedule with minimal operational disruption
  • Strengthened expertise in marine loading arm installations
DUBAI NATURAL GAS CO. LTD (DUGAS)

Marine Loading Arms Upgrade – JAFZA

Project Title

Marine Loading Arms Upgrade – JAFZA

Client

Dubai Natural Gas Co. Ltd

Location

JAFZA, Dubai, UAE

Year

2021–2022

Contract Type

Construction

Project Overview

Tekzone executed the dismantling of four existing 16-inch FMC Marine Loading Arms and installation of two new 16-inch KANON Marine Loading Arms at JAFZA Berth 1. The project included civil, mechanical, piping, and electrical & instrumentation works, improving operational efficiency.

Scope Highlights

  • Removal of 4 existing 16” FMC Marine Loading Arms
  • Installation of 2 new 16” KANON Marine Loading Arms
  • Civil works for MLA foundations
  • Mechanical and piping installations
  • Electrical and instrumentation works

Key Achievements

  • Improved efficiency of marine loading operations
  • Seamless integration with existing infrastructure
  • Delivered with full safety compliance
EPPCO INTERNATIONAL LTD

JET A-1 Marine Loading Arm Installation – JAFZA

Project Title

JET A-1 Marine Loading Arm Installation – JAFZA

Client

EPPCO International Ltd

Location

JAFZA Berth 2, Dubai, UAE

Year

2021–2023

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone delivered a full EPC project involving the removal of an existing 6” FMC Marine Loading Arm and installation of a new 12” KANON Marine Loading Arm. The project included civil, mechanical, piping, electrical, and instrumentation works, along with additional DEWA power supply integration.

Scope Highlights

  • Removal of existing 6” FMC Marine Loading Arm
  • Supply and installation of new 12” KANON Marine Loading Arm
  • Civil works for MLA foundation
  • Mechanical and pipeline installations
  • Electrical and instrumentation works
  • Integration of additional DEWA power supply

Key Achievements

  • Improved safety and efficiency in jet fuel handling
  • Delivered full lifecycle EPC solution
  • Strengthened capabilities in heavy equipment installations
DRY CONVEYING SYSTEM PROJECTS

Briquette Feeding Conveyor System – SMP I & SMP II

Project Title

Briquette Feeding Conveyor System – SMP I & SMP II

Client

Emirates Steel

Location

Abu Dhabi, UAE

Year

2020

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone executed an EPC project for Emirates Steel, covering the design, supply, installation, and commissioning of a briquette feeding conveyor system. The project enhanced material handling efficiency and operational performance.

Scope Highlights

  • Design, supply, and erection of conveyor systems
  • Installation of auxiliary equipment and feeding hoppers
  • Associated piping and electrical works
  • MCC panels installation and modifications
  • Power and communication cabling, sensors, and instrumentation
  • Cable tray installation and supports
  • Commissioning of installed systems

Key Achievements

  • Optimized dry conveying system performance
  • Seamless integration of electrical and instrumentation systems
  • Improved operational efficiency
  • Strengthened presence in steel industry projects
SILAL

Wheat Silo Expansion Project

Project Title

Wheat Silo Expansion Project

Client

SILAL

Location

Abu Dhabi, UAE

Year

2023

Contract Type

Construction

Project Overview

Tekzone executed the construction of the Wheat Silo Expansion Project, including conveyors, piping, and electrical systems, enhancing grain storage and handling capacity.

Scope Highlights

  • Installation of conveyors and auxiliary equipment
  • Piping and ducting works
  • Electrical and instrumentation systems (LVDBs, MCCBs)
  • Power and communication cabling
  • Sensors and instrumentation
  • Cable trays and support systems
  • Commissioning support

Key Achievements

  • Expanded silo capacity efficiently
  • Implemented robust dry conveying systems
  • Ensured compliance with industrial standards
  • Strengthened expertise in food & beverage infrastructure
DEWA

Refurbishment of DFO MLA-5A & 5B – JAFZA

Project Title

Refurbishment of DFO MLA-5A & 5B – JAFZA

Client

Dubai Electricity and Water Authority (DEWA)

Location

JAFZA, Dubai, UAE

Year

Ongoing

Contract Type

Construction

Project Overview

Tekzone executed a refurbishment project for DEWA involving the complete overhaul of two existing 12-inch FMC Marine Loading Arms at Berth No. 5, JAFZA. The scope included mechanical and pipeline installation works, ensuring safe and efficient marine loading operations.

Scope Highlights

  • Dismantling of existing FMC Marine Loading Arms
  • Shifting of MLAs to TEKZONE yard
  • Overhauling and refurbishment of MLAs at yard
  • Installation of refurbished 12” FMC Manual Marine Loading Arms
  • Mechanical and piping works
  • Project approvals and coordination

Key Achievements

  • Enhanced safety and efficiency of marine loading operations
  • Completed within schedule with minimal operational disruption
  • Strengthened expertise in marine loading arm installations

  • Adnoc – Marine Fuel Station Ras Al Gurab
  • Adnoc – SS 626 UAQ Marine Service Station
  • Adnoc – Service Station #625 (Rak)
  • Adnoc – Service Station #781 (Fisherman Port)
  • Adnoc – Habshan Camp Filling Station
Adnoc – Marine Fuel Station Ras Al Gurab

Replacement of Marine Fuel Pontoons – Service Station #625

Project Title

Replacement of Marine Fuel Pontoons – Service Station #625

Client

Abu Dhabi National Oil Company (ADNOC)

Location

Abu Dhabi, UAE

Year

2024

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone executed a critical EPC marine infrastructure project for ADNOC involving the replacement of marine fuel pontoons at Service Station #625. The project included complete demolition of existing structures and installation of new aluminium pontoons with GRP floats, along with guide piles, MEP systems, electrical works, and canopy installation.

The project significantly improved operational safety, fuel handling efficiency, and marine station reliability.

Scope Highlights

  • Design, supply, fabrication, and installation of aluminium pontoons with GRP floats
  • Supply and installation of guide piles (piling works)
  • Complete MEP works (mechanical, piping, and structural integration)
  • Demolition and removal of existing pontoon and gangway
  • Electrical works for pontoon systems and control integration
  • Supply and installation of ADNOC canopy structure

Key Achievements

  • Enhanced marine fuel station safety and operational efficiency
  • Successful execution of full demolition and replacement works
  • Integrated piling, MEP, and electrical systems in marine environment
  • Delivered fully operational EPC solution with zero compromise on safety
Adnoc – SS 626 UAQ Marine Service Station

Replacement of Marine Fuel Pontoons – Service Station #626

Project Title

Replacement of Marine Fuel Pontoons – Service Station #626

Client

Abu Dhabi National Oil Company (ADNOC)

Location

Abu Dhabi National Oil Company (ADNOC)

Year

2023

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone executed a critical EPC marine infrastructure project for ADNOC involving the replacement of marine fuel pontoons at Service Station #626, Umm Al Quwain. The project included complete demolition of existing pontoon systems and installation of new aluminium pontoons with GRP floats, along with guide piles, MEP works, electrical systems, and canopy installation.

The project enhanced marine fueling safety, operational efficiency, and long-term station reliability.

Scope Highlights

  • Design, supply, fabrication, and installation of aluminium pontoons with GRP floats
  • Supply and installation of guide piles (piling works)
  • Complete MEP works including mechanical and marine system integration
  • Demolition and removal of existing pontoon and gangway
  • Electrical works for pontoon systems and control integration
  • Supply and installation of ADNOC canopy structure

Key Achievements

  • Improved safety and efficiency of marine fuel operations
  • Successful demolition and full replacement of pontoon system
  • Integrated piling, MEP, and electrical systems in marine environment
  • Delivered fully operational EPC marine solution with high reliability
Adnoc – Service Station #625 (Rak)

Replacement of Marine Fuel Pontoons – Service Station #625

Project Title

Replacement of Marine Fuel Pontoons – Service Station #625

Client

Abu Dhabi National Oil Company (ADNOC)

Location

Ras Al Khaimah, UAE

Year

2022

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone executed a critical EPC project involving the replacement of marine fuel pontoons at ADNOC Service Station #625. The project enhanced operational efficiency and reliability through advanced aluminium pontoons with GRP floats, integrated marine fuel piping systems, and complete electrical & instrumentation solutions.

Scope Highlights

  • Excavation and backfilling for infrastructure preparation
  • Design, supply, fabrication, and installation of aluminium pontoons with GRP floats
  • Construction of operator kiosk and canopy
  • Installation of fuel dispensers and marine fuel piping systems
  • Electrical cabling and integration with fuel control panels
  • Dismantling of existing pontoons

Key Achievements

  • Improved fuel dispensing efficiency and reliability
  • Delivered upgraded infrastructure with safety-focused design
  • Successful testing and commissioning ensuring operational excellence
Adnoc – Service Station #781 (Fisherman Port)

Replacement of Marine Fuel Pontoons – Service Station #781

Project Title

Replacement of Marine Fuel Pontoons – Service Station #781

Client

Abu Dhabi National Oil Company (ADNOC)

Location

Fisherman Port, UAE

Year

2022

Contract Type

Engineering, Procurement & Construction (EPC)

Project Overview

Tekzone executed a turnkey EPC project for replacing marine fuel pontoons at Service Station #781. The project improved marine fueling operations through aluminium pontoons with GRP floats, integrated pipeline systems, and electrical & instrumentation works.

Scope Highlights

  • Excavation, backfilling, and infrastructure preparation
  • Design, fabrication, and installation of aluminium pontoons with GRP floats
  • Construction of operator kiosk and canopy
  • Installation of fuel dispensers and marine fuel piping systems
  • Electrical cabling and control panel integration
  • Dismantling of existing pontoons

Key Achievements

  • Enhanced reliability of marine fueling operations
  • Delivered complete turnkey EPC solution
  • High-quality execution with safety compliance
Adnoc – Habshan Camp Filling Station

Habshan Camp Filling Station Upgrade

Project Title

Habshan Camp Filling Station Upgrade

Client

Habshan Camp Filling Station Upgrade

Location

Habshan, Abu Dhabi, UAE

Year

2016

Contract Type

Procurement & Construction

Project Overview

Tekzone upgraded the ADNOC Drilling Habshan Camp Filling Station, enhancing fuel handling infrastructure through advanced fuel dispensers, jacketed piping systems, and high-capacity storage tanks. The project reflects Tekzone’s expertise in industrial facility upgrades and fuel system infrastructure.

Scope Highlights

  • Excavation and backfilling works
  • Supply and installation of advanced fuel dispensers
  • Fuel piping using jacketed piping systems
  • Installation of high-capacity fuel storage tanks
  • Electrical cabling and instrumentation works

Key Achievements

  • Improved fuel dispensing efficiency and reliability
  • Enhanced infrastructure with safety-focused design
  • Successful testing and commissioning
  • Strengthened expertise in fuel system EPC projects

  • Emirates Steel
  • Emirates Steel
  • Emirates Global Aluminium
  • Crown Emirates
  • Emarat
  • Emirates Steel
Emirates Steel

Emirates Steel – Plant Major Shutdown for Top Gas Recuperator Replacement

Project Title

Emirates Steel – Plant Major Shutdown for Top Gas Recuperator Replacement

Client

Emirates Steel

Location

Abu Dhabi, UAE

Year

2022

Contract Type

Construction / Plant Shutdown

Project Overview

In 2022, Tekzone expertly managed a critical plant shutdown for Emirates Steel at DRP 2, focusing on the replacement of a top gas recuperator. The project included essential structural works and the fabrication and installation of structural steel members at a challenging height of 80 meters, reinforcing Tekzone’s expertise as a leading industrial shutdown contractor in Abu Dhabi.

Scope Highlights

  • Structural steel fabrication and installation completed within 8 days
  • Deployment of 200 workers across day and night shifts
  • Supply and installation of ducting during shutdown
  • Safe coordination of high-altitude works with zero lost time incidents (LTI)

Key Achievements

  • Minimal plant downtime during shutdown
  • Efficient execution of high-altitude structural works
  • Reinforced reputation as a leading industrial shutdown contractor in the UAE
Emirates Steel

Emirates Steel – Plant Major Shutdown for Pipe Replacement Works

Project Title

Emirates Steel – Plant Major Shutdown for Pipe Replacement Works

Client

Emirates Steel

Location

Abu Dhabi, UAE

Year

2022

Contract Type

Construction / Plant Shutdown

Project Overview

Tekzone executed a major pipe replacement shutdown at DRP 01 for Emirates Steel. The project demanded precise coordination over 10 days to replace piping and ensure minimal operational impact, positioning Tekzone as a trusted factory shutdown contractor in Dubai.

Scope Highlights

  • Installation of 3000 inches of pipe welding
  • Rope access service for 80-meter-high pipe structures
  • Deployment of 350 personnel across day and night shifts
  • Comprehensive safety arrangements with zero LTI

Key Achievements

  • Seamless execution of complex high-rise piping installation
  • Demonstrated expertise as factory shutdown contractors in Dubai
  • Maintained plant operational efficiency during critical shutdown
Emirates Global Aluminium

EGA – Plant Shutdown for Superstructure Installation

Project Title

EGA – Plant Shutdown for Superstructure Installation

Client

Emirates Global Aluminium

Location

Abu Dhabi, UAE

Year

2022

Contract Type

Construction / Plant Shutdown

Project Overview

In 2022, Tekzone carried out a plant shutdown for superstructure installation at Emirates Global Aluminium, focusing on silos and shuttle conveyor structures across Phase 1 & 2, highlighting Tekzone’s capability in EPC plant shutdown projects in the UAE.

Scope Highlights

  • Supply and installation of superstructure steel members
  • Structural steel fabrication and installation
  • 8-day project execution with 100 personnel in day and night shifts

Key Achievements

  • Efficient completion within a tight timeframe
  • Maintained safety and operational continuity
  • Demonstrated expertise in complex industrial shutdown services in the UAE
Crown Emirates

Crown Emirates – Beverage Can Line Modernization & Factory Shutdown

Project Title

Crown Emirates – Beverage Can Line Modernization & Factory Shutdown

Client

Crown Emirates

Location

Dubai, UAE

Year

2023

Contract Type

Construction / Industrial Shutdown

Project Overview

Tekzone executed a strategically planned factory shutdown to modernize beverage can lines for Crown Emirates, ensuring minimal production downtime. The project showcased Tekzone’s proficiency in hygienic piping installation and factory upgrade EPC contractor services.

Scope Highlights

  • Removal of old beverage can lines, conveyors, and piping
  • Civil and electrical modifications for new line installation
  • Installation of stainless steel, carbon steel, and hygienic piping systems
  • Electrical cabling, panel installation, and IR testing

Key Achievements

  • Seamless factory upgrade with minimal operational disruption
  • High-quality installation of state-of-the-art equipment
  • Reinforced position as top industrial shutdown contractors in the UAE
Emarat

Emarat – 48-inch Natural Gas Pipeline Replacement

Project Title

Emarat – 48-inch Natural Gas Pipeline Replacement

Client

Emirates General Petroleum Corp. (EMARAT)

Location

UAE

Year

2023

Contract Type

Engineering, Procurement & Construction / Plant Shutdown

Project Overview

Tekzone managed a critical pipeline replacement shutdown for Emarat, replacing an underground section of a 48-inch natural gas pipeline. The project involved deep excavation, pipe preparation, and installation within a tight 5-day shutdown, positioning Tekzone as a leading EPC gas pipeline project contractor in the UAE.

Scope Highlights

  • Obtaining NOCs and conducting engineering survey
  • Deep excavation and dewatering down to 8 meters
  • Cold cutting, removal, and installation of new pipeline sections
  • Demagnetization system and nitrogen purging for 14 km pipeline
  • Extensive testing and commissioning

Key Achievements

  • Minimal operational downtime during pipeline replacement
  • Safe execution of high-risk pipeline works
  • Demonstrated expertise as leading plant shutdown contractors in the UAE
Emirates Steel

Emirates Steel – Plant Major Shutdown for Top Gas Recuperator Replacement

Project Title

Emirates Steel – Plant Major Shutdown for Top Gas Recuperator Replacement

Client

Emirates Steel

Location

Abu Dhabi, UAE

Year

2025

Contract Type

Construction / Plant Shutdown

Project Overview

In 2025, Tekzone expertly managed a critical plant shutdown for Emirates Steel at Direct Reduction Plant 1, focusing on the replacement of a top gas recuperator. The project included essential structural works and the fabrication and installation of structural steel members at a challenging height of 80 meters, reinforcing Tekzone’s expertise as a leading industrial shutdown contractor in Abu Dhabi.

Scope Highlights

  • Structural steel fabrication and installation completed within 8 days
  • Deployment of 200 workers across day and night shifts
  • Supply and installation of ducting during shutdown
  • Safe coordination of high-altitude works with zero lost time incidents (LTI)

Key Achievements

  • Minimal plant downtime during shutdown
  • Efficient execution of high-altitude structural works
  • Reinforced reputation as a leading industrial shutdown contractor in the UA