Project Title
Diversion of Underground 14” High Pressure Gas Pipeline from Railway Corridor for Etihad Rail Project
Type of Contract
Construction
Year of Execution
2020-2021
System
- High-Pressure Gas Pipe line
- Hot tapping
- 3LPE coating
- Fiber Optic Communication Cable network
Mechanical Works
Supply, fabrication and Installation of Underground 14” Carbon Steel Pipeline with 3LPE Coating, cathodic protection and hot tapping services
Electrical & Instrumentation
Fiber Optic cable network for the pipeline valve operations to communicate with central control room.
Approvals Obtained
Fujairah Municipality, Emarat
Civil
Site survey, engineering and supervision for the civil excavation, backfilling, red sand laying for laying the pipe at hill area
Shutdown
Shutdown for connecting the pipeline to the main Emarat gas distribution pipeline