China Railway Construction Corporation Limited & National Projects & Construction LLC Joint Venture (CRCC-NPC JV)

PROJECT TITLE

Diversion of Underground 14” High Pressure Gas Pipeline from Railway Corridor for Etihad Rail Project

TYPE OF CONTRACT

Construction

YEAR OF EXECUTION

2020-2021

SYSTEM

  • High-Pressure Gas Pipe line
  • Hot tapping
  • 3LPE coating
  • Fiber Optic Communication Cable network

MECHANICAL WORKS

Supply, fabrication and Installation of Underground 14” Carbon Steel Pipeline with 3LPE Coating, cathodic protection and hot tapping services

ELECTRICAL & INSTRUMENTATION

Fiber Optic cable network for the pipeline valve operations to communicate with central control room.

APPROVALS OBTAINED

Fujairah Municipality, Emarat

CIVIL

Site survey, engineering and supervision for the civil excavation, backfilling, red sand laying for laying the pipe at hill area

SHUTDOWN

Shutdown for connecting the pipeline to the main Emarat gas distribution pipeline