MATTEX GROUP

Project Details

Client: ATYAB AL-KARAM INTERNATIONAL COMPANY LTD

Project Description

PROJECT TITLE

Factory relocation – relocation of equipment from mattex fabrics dubai/mattex yarns Abu Dhabi To Mattex Fabrics, Jeddah, Saudi Arabia

TYPE OF CONTRACT

TURNKEY CONTRACT

YEAR OF EXECUTION

2021 – 2022

MAJOR EQUIPMENTS

Barmag Extrusion Machines, SULZER Weaving Looms, KARL MAYER Beaming Machine, Stretching Oven, Fixation Oven, Electrical/Control Cabinets, Static Rotary Machineries, Storage Silos, Debagging unit

ELECTRICAL & INSTRUMENTATION

LV Panels, MCCs, SMDBs, VFD & HMI/Control Panels. Power/control/signal/communication Cables. Field isolators, sensors, instruments & components. Cable trays and cable management systems.

MECHANICAL

Compressed Air & Chilled Water Piping. Debagging unit – Belt Conveyor, Platform, Pneumatic Lifter, Hoppers. Air Compressor, dryer, air receiver tanks. Dismantling, loading, transportation, unloading & reinstallation of 04 nos polymer storage silos (300 m 3 Capacity & 23m Height)

PACKING

More than 400 containers of machineries. Seaworthy vacuum packaging. Tagging and shipping using wooden crates. Document generation using images and videos. Container/Truck Loading