Dubai Natural Gas Co LLC (DUGAS)

Project Details

Client: ATYAB AL-KARAM INTERNATIONAL COMPANY LTD

Project Description

PROJECT TITLE

Removal & installation of Marine Loading Arms at DUGAS jetty area, Berth – 1

TYPE OF CONTRACT

Construction

YEAR OF EXECUTION

2021-2022

SYSTEM

  • Marine Loading Arms (MLA)
  • Electrical and Instrumentation
  • Hydraulic Power Packs
  • Header Piping for MLA
  • Cable management – Copper-free Aluminum Conduits
  • Hydraulic & Instrumentation Tubing

MECHANICAL WORKS

  • Dismantling of existing 04 nos Marine Loading Arms (MLAs) – MTBE/Methanol, Butane/Propane. Erection, testing & commissioning of 02 nos  new KANON MLAs. Berth Piping, Tie in connections, Hydraulic Power Units, Hydraulic SS Tubing Network.
  • Dismantling and handing over redundant systems to DUGAS upon project completion.
  • Transportation of redundant MLAs from Berth 01 to DUGAS Premise.
  • Transportation of new MLAs from DUGAS to Berth 01

 

ELECTRICAL &  INSTRUMENTATION

  • Electrical/control equipment installations; Hydraulic Power Packs (HPU) Jetty Operator Control Cabinet (JOCC), Solenoid Valve Block Panel.
    Power/control cabling from Control Room to Berth Equipment.
  • Design, supply, and installation of copper-free aluminum conduits for cable routing. Integration & interfacing of new MLAs with the existing
    control system. Instrumentation tubing.

APPROVALS OBTAINED

TRAKHEES (EHS & CED), Dubai Civil Defense (DCD), JAFZA, Tanker Berth Permits, DP world

CIVIL

Site survey, New MLA foundation design, Demolition of old foundations, and construction of new foundations for MLAs.

SHUTDOWN

Sequential shutdown of MLAs for uninterrupted operation of berths.