Project Details
Client: ATYAB AL-KARAM INTERNATIONAL COMPANY LTD
Project Description
PROJECT TITLE
Installation of 1km long 48″ Internal and External FBE Coated Pipeline for Potable Water Network in Bridge 1 and Bridge 2 Between Reem Island and Umm Al Lafina
TYPE OF CONTRACT
Pipeline Installation
YEAR OF EXECUTION
2020-2021
SYSTEM
- Pipeline Installation (CS and GRP)
- Internal and External FBE Coating on Field Joints
- Installation through Bridge Girder
- Customized installation using in- house developed motorized rack and pinion pushing arrangement.
- Specially designed Permanent Saddle Support with roller wheel
- Hydrotest for the pipeline
MECHANICAL WORKS
- Fabrication, Installation, Testing, and Commissioning of 1km long 48″ (1.2m) Dia Internal and External FBE coated Carbon Steel Pipeline for Potable water network.
- Fabrication, Installation, Testing and Commissioning of 1km long GRP
Pipeline as per below- DN 900 – ADDC Water Line
- DN 900 – Storm Water Line
- DN 300 – Sewerage Water Line
ELECTRICAL & INSTRUMENTATION
N/A
STRUCTURAL WORKS
Custom-designed, TRANSCO-approved rigging system comprising Rack & Pinion, motor, rail arrangement, working platform, temporary saddle support etc. for the installation/pushing of the pipeline through the bridge girder and GRP diaphragm.
APPROVALS OBTAINED
TRANSCO/ADDC/MUSANADA/ADWEA
SHUTDOWN
N/A